Link to Sales - Services Link to UPS Link to Products Link to Case Studies Link to Service - Services
  17 May 2008
 
Battery Services

  In most cases your UPS will be powered by batteries during a utility failure and therefore imperative that you are confident that your batteries will perform when required.

All batteries have a design life although our experience has taught us that there are a number of key factors which will determine the actual life of your battery system. Heat, cold, incorrect charging and a lack of “exercising” can all reduce a batteries lifetime.

To help you ensure you are getting the most from your batteries, Harland Simon UPS will check and “exercise” your battery system as part of our standard UPS service and maintenance contract.

We also provide a number of enhanced service offerings which can be purchased separately or added to one of our standard service and maintenance contracts to ensure optimum battery performance:

 
  • Battery Impendence testing
  • DC Load Bank testing
  • One-off Battery Maintenance visit

  • Home |  Sales |  Service |  NHS |  About Us |  Our Customers |  Feedback  |  Contact Us
    © 2008 Harland Simon UPS