Comms/IT Power Solution Case Studies

Comms/IT UPS Case Studies

3 x Riello Single Phase UPS Systems

Maidstone TV Studios (Custodian Data Centre) asked Harland Simon UPS to provide a UPS system capable of supporting 300kVA / 240kW for approximately 6 minutes.

Read more

DC UPS & 10 year Life Batteries

Optilan required a solution to provide 48vDU from a 120vAC input source rated at 1.2kW with the ability to support this load for 12 hours in the event of mains failure.

Read more