2 x 20kVA IP54 Positive Pressure Systems
|
|
Total Value: <£50K
|
|
Timescale: Mar 2011
|
|
United Utilities have had issues with 2 off 3 Phase UPS's used to ensure Actuator operation in event of flooding at the Birkenhead WWTW. We have custom designed and built 2 x Positive Pressure IP54 systems to exclude Hydrogen Sulphide Gas which can corrode the circuit boards and components of the UPS systems.
|
National Grid
|
1 x Eaton 6kVA 9130 & 2 x EXB
|
|
Total Value: <£10K
|
|
Timescale: Feb 2011
|
|
We supplied a replacement unit for a faulty system which has provided Harland Simon with the ability to become an approved supplier to the National Grid.
|
Scottish Water Solutions
|
Cyclic UPS MLT15 + Battery Cubicle + NPC38-12
|
|
Total Value: <£10K
|
|
Timescale: Jun 2009
|
|
|
CEMA - Yorkshire Water
|
2 x IP54 Wall Enclosure UPS
|
|
Total Value: <£10K
|
|
Timescale: May 2009
|
|
Part of a contract to supply IP54 Wall Enclosures for Yorkshire Water sites. Each Enclosure contains a UPS to support a 1kVA Load for 15 minutes. Enclosures were supplied complete with External Bypass Switches and painted in Yorkshire Water Colours.
|
CEMA - Yorkshire Water
|
2 x IP54 Wall Enclosure UPS
|
|
Total Value: <£10K
|
|
Timescale: Apr 2009
|
|
This was a contract to Supply 2 x IP54 Wall Mount Enclosures for a Yorkshire Water site in Doncaster. The systems consist of a 3kVA UPS to backup an 11A Load for 15 minutes. A separate Battery Pack was incorporated into the system to provide the Autonomy.
|
South West Water
|
Riello 10kVA UPS
|
|
Total Value: <£10K
|
|
Timescale: Dec 2008
|
|
Supplied Riello 10kVA UPS to support Site Monitoring Equipment.
|
TES NI Ltd
|
80kW IP54 Converter
|
|
Total Value: <£50K
|
|
Timescale: Sep 2008
|
|
Supply 80kW IP54 Converter for Single Phase Supply to Three Phase and support all critical equipment on site in Altnaharra for Scottish Water.
|
AND Automation
|
15kVA UPS
|
|
Total Value: <£10K
|
|
Timescale: Sep 2008
|
|
Supply 15kVA UPS which will be installed within the Customer's Panel for a Water Company application.
|
Galliford Try Costain Atkins Joint Venture - Bolton WTW
|
3 x IP54 3 Phase AC UPS
|
|
Total Value: <£50K
|
|
Timescale: Jun 2008
|
|
Galliford Try Costain Atkins Joint Venture was awarded a number of contracts by United Utilities as part of a £2.9 billion Asset Management Programme (AMP4) covering water and wastewater improvements throughout NW England.
|
Lintott - Scottish Water
|
12 x IP54 Rack Mounted UPS Systems
|
|
Total Value: <£100K
|
|
Timescale: 2007
|
|
Harland Simon was awarded the contract to Supply approx. 12 x 19" Rack Mounted IP54 UPS Systems to support various loads totalling 1298VA for 12 hours plus Fast Charger and Distribution, etc. The Systems were configured to be installed into Prefabricated Containers at various remote Scottish Water Sites.
|
Lintott Controls - SW Tarkskavavaig
|
2kVA IP54 UPS System
|
|
Total Value: <£10K
|
|
Timescale: 2007
|
|
Harland Simon supplied a 2kVA UPS System capable of supporting 12 hours, housed in an IP54 19" Rack Enclosure.
|
Tyco - Limehouse Tunnel
|
4 x AC UPS Systems
|
|
Total Value: <£50K
|
|
Timescale: 2007
|
|
Harland Simon was awarded the contract to Supply, Deliver and Commission 1 x 15kVA, 1 x 10kVA and 2 x 3kVA AC UPS Systems each to support 4 hours complete with SNMP Communications. Our Site Services included the Delivery and Positioning, Battery Build and Commissioning of each unit.
|
Agrilek - Castle Carrock WWTW
|
15kVA UPS
|
|
Total Value: <£10K
|
|
Timescale: 2007
|
|
Harland Simon was awarded the contract to Supply, Deliver and Commission a 15kVA 3 Phase UPS System for use on a WWTW Site in Cumbria.
|
Galliford Costain /Atkins Joint Venture - Prenton WTW
|
10kVA AC UPS
|
|
Total Value: <£50K
|
|
Timescale: 2007
|
|
Harland Simon was awarded the contract to Supply, Deliver and Commission a 10kVA Powerware PW9355 housed completely within our IP54 Enclosure. The Design of this system also allowed for both a 400VAC and a 110VAC output, as specified by the client.
|
Tyco Integrated Systems - BNFL
|
6kVA AC UPS
|
|
Total Value: <£50K
|
|
Timescale: 2007
|
|
Harland Simon supplied an IP31 19" Rackmounted UPS Solution for use on a BNFL site. Our contract included not only our Custom Designed Rackmount IP31 Enclosure but also a Step Down Transformer to accommodate 110VAC output. We also undertook Factory Witness Testing and on-site Commissioning.
|
CSE Servelec - Gt. Yarmouth Power Station
|
3kVA N+1 AC UPS
|
|
Total Value: <£50K
|
|
Timescale: 2007
|
|
Harland Simon was awarded the contract to Supply, Deliver, Install and Commission a 3kVA N+1 System ensuring the entire system has no single point of failure.
|
United Utilities - Southport
|
5kVA UPS with Long Runtimes
|
|
Total Value: <£10K
|
|
Timescale: 2007
|
|
Harland Simon was awarded the contract to Supply and Deliver a 5kVA UPS System capable of supporting 3 hours. We achieved this above average Runtime by using our specially designed Extended Runtime Battery Packs which come ready assembled in an IP21 Enclosure.
|
AT Group - Wayoh WTW
|
IP54 3 Phase AC UPS
|
|
Total Value: <£50K
|
|
Timescale: 2006
|
|
Harland Simon was awarded the contract to Supply, Deliver and Commission a 30kVA UPS System to support 3 hours housed within our IP42 Enclosure complete with 10 year design Life Batteries.
|
Galliford Costain / Atkins Joint Venture
|
IP54 3 Phase AC UPS IP54 1 Phase AC UPS IP54 1 Phase AC UPS
|
|
Total Value: <£50K
|
|
Timescale: 2006
|
|
Harland Simon was awarded the contract to Design, Manufacture and Supply 3 x UPS Systems complete with High Performance Batteries housed within IP54 Enclosures. The contract included Full Site Services.
|
Bromborough WWTW - Purac / United Utilities
|
3 x IP54 3 Phase AC UPS
|
|
Total Value: >£50K
|
|
Timescale: 2002 - 2004
|
|
AMEC-PURAC Joint Venture, a £28 million contract to provide new treatment facilities at Bromborough Wastewater Treatment Works. As part of this contract Purac awarded Harland Simon UPS a sub-contract to design, supply and install various UPS.
|
ABNA Factory - Maindec
|
UPS and Generator
|
|
Total Value: <£100K
|
|
Timescale: 2004
|
|
Harland Simon provided a 60kVA UPS and a 150kVA Generator to Protect the Main Server Room. We also undertook Site Building, Mechanical and Electrical Works.
|
British Nuclear Power (BNFL)
|
1 x DC UPS 3 x AC UPS 1 x AC UPS
|
|
Total Value: <£100K
|
|
Timescale: 1999/2002/2004
|
|
Harland Simon were asked to Manufacture a DC UPS to provide Critical BackUp Power for an Evacuation Alarm at Sellafield for Tyco. Chubb, a major manufacturer of Security Systems requested Harland Simon to supply a number of AC UPS to provide BackUp Power for the Crucial Security System at a Nuclear Power Station.
|
Blackburn Starling
|
300+ AC UPS & Batteries
|
|
Total Value: >£100K
|
|
Timescale: 1999 - ongoing
|
|
Harland Simon have supplied Special and Standard AC & DC UPS for over 5 years. We have supplied standard Powerware & MGE AC UPS as well as Customised IP54 Systems and Extended Runtime Battery Solutions to be installed into MCC Panels to support SCADA, PLC and Emergency Pumps all over the UK and Ireland at Water Treatment Plants.
|
|
|