|
Harland Simon, through a local electrical contractor, GR Bailey, were awarded the order to supply and commission a new 30kVA Riello UPS for a new server room. The MLT 30 was chosen as it complied with the specification provided including high operating efficiency, low THDi<3% and Input Power Factor 0.99.
|