GR Bailey

30kVA UPS for Aintree Hospital

Total Value: <£10K
Timescale: May 2010

Harland Simon, through a local electrical contractor, GR Bailey, were awarded the order to supply and commission a new 30kVA Riello UPS for a new server room.
The MLT 30 was chosen as it complied with the specification provided including high operating efficiency, low THDi<3% and Input Power Factor 0.99.

Briggs & Forrester

160kVA / 20 mins & Bypass

Total Value: <£50K
Timescale: Aug 2009

160kVA / 20 mins & bypass for the Four Seasons Hotel, Park Lane.

FW Marsh Ltd

10kVA UPS

Total Value: <£10K
Timescale: Jul 2009

10kVA Riello UPS for Parkhurst Prison.

PPI Engineering

110v DC Tripper

Total Value: <£10K
Timescale: Jan 2009

PPI needed a cost effective 110v Tripper for their end client-National Grid in Gibraltar for their Substation Tripping.

Tech Mahindra (UK Head Office)

Dual Redundant N+1 30kVA/1 hour PW9355 UPS
60kVA/7 mins PW9390 UPS

Total Value: <£100K
Timescale: 2007 -2008
In 2007 Harland Simon was awarded the contract to supply an N+1 30kVA Powerware 9355 UPS system to support Tech Mahindra's main data centre.
Site services included the specialised delivery and on-site battery rebuild, specified to site constraints and the commissioning.
In addition, we were also awarded the maintenance contract for the UPS system. In 2008 we supplied a 60kV UPS to support office equipment.